Construction Update III11/23/2018 The Taproom has a Bar! Since our last update, a lot has been accomplished! The work being done might not be as dramatic as a new wall going up, or ceilings being completed (and hence, a little harder to document with my poor camera skills), but the guys have been rocking out the work and we are getting very close to wrapping this phase up, and moving onto the next phase: making beer! Here are some recent pictures: Lights in the front of the house are in. Very Important Stuff Here! CO2 installed with Lines Run to the Cooler so We Can Pour You Some Beer! Barring any further hiccups, construction should wrap up around the first week of December. Then we have some inspections to get through, both for the local building department as well as the State Liquor Control Commission. As long as those go well, we should be making beer by middle of December with an anticipated opening date of mid to late January. Next Update Should Have Some Pictures that Look Like This:
|